Move the price. Watch where the power goes.
Rough model: 20 J/TH machines (50 PH per MW), ~0.000502 BTC per PH per day at ~915 EH/s (Hashrate Index, Aug 31, 2026), fees ignored. AI lease ≈ Hut 8's projected $454M/yr net operating income ÷ 330 MW of utility power. Ignores equipment and construction costs. Illustrative only — not a forecast or investment advice. Source: AI Super Simplified.